Architecture combining tradition and modernity

 

 

BUILDING FINISH STANDARD

Element Description
Building technology
Foundations
  • Existing – masonry brick
  • New – reinforced concrete slab
Roof
  • Reinforced concrete slab
Construction system
  • Existing walls - masonry brick
  • New walls – masonry ceramic block
External walls
  • Masonry wall + thermal insulation
Elevation
  • Mineral plaster, styrofoam, mineral wool
  • Front elevation - sandstone
  • Part of internal elevation – marble, metal net panel
Partition walls between apartments
  • Masonry – ceramic block
Housing apartment
Partition walls in apartments
  • Toilets - masonry
  • Others - gypsum board
Internal partition walls finish
  • Cement-lime plaster
  • Painted twice white
Ceiling finish
  • Gypsum suspended ceiling
  • Painted twice white
Floor finish
  • screed
Windows
  • Wooden window frame: k=1,1W/m2k, Air infiltration 0,5-1,0m3/m*h*daPa2/3
Apartment entrance door
  • Anti-burglar, fire resistance EI 30
Heating system
  • From local heat supplier Dalkia – with heat meter
  • Living room – temperature control
  • Steel heaters
Plumbing installation
  • Kitchen, toilets – water and sewage connections according to the design
Cold and hot water, gas meter
  • Separate meter for each apartment
Gas
  • Gas connection according to the design
Ventilation, air-conditioning
  • Kitchen – gravity ventilation
  • Toilets – mechanical ventilation
  • Air-conditioning
Electrical installation
  • 3-phase power supply for electric oven in the kitchen
  • Sockets and lighting outlets without light fittings
  • Entryphone installation
  • Lightning protection
 
TV installation
  • RTV installation with sockets in living rooms and bedrooms
Telephone installation
  • Telephone installation with socket in living room
Internet installation
  • Internet installation with sockets in living room and bedrooms
Video intercom system
  • Video intercom panel at the hall or entrance door
CCTV security system
  • External cameras monitored from security/reception room
Office
Partition walls in offices
  • Gypsum board
Wall finish
  • Existing front walls – existing plaster to be removed, impregnated
  • Other existing walls – refurbished, painted
  • New masonry walls – cement-lime plaster, painted twice
  • New gypsum walls – painted twice
Ceiling finish
  • Front – suspended ceiling
  • Wing – suspended ceiling
Floor finish
  • Parquet
  • III floor – original parquet after renovation
  • Wet rooms – floor tiles
Windows
  • Wooden window frame: k=1,1W/m2k, Air infiltration 0,5-1,0m3/m*h*daPa2/3
Window sills
  • Front – existing
 
Entrance doors
  • Glass doors
  • Wings – fire resistant EI30
Heating system
  • From local heat supplier Dalkia – with heat meter
  • Air/heating units
Plumbing installation
  • Kitchen, toilets – water and sewage connections according to the design
Cold, hot water and heating meters
  • Separate meter for each office
 
Ventilation, air-conditioning
  • Mechanical ventilation
  • Air-conditioning
Electrical installation
  • Sockets and lighting outlets with light fittings
  • Entry phone installation
  • Lightning protection
 
TV installation
  • RTV installation with sockets
Telephone installation
  • Telephone installation with sockets
Internet installation
  • Internet installation with sockets
CCTV security system
  • External cameras monitored from security/reception room
Balcony / Terrace
Floor
  • Terraces – timber deck
  • Green terraces – vegetation mat
  • Balcony - granitegress
Balustrades and dividers
  • Balustrades – metal open work and masonry filled work
  • Dividers – light open work
Electrical installation
  • External lighting system without light fittings
Entrance area
Entrance door
  • Metal gate - reconstruction according to the historical style
Internal walls and ceiling finish
  • Existing walls and ceiling to be renovated
Floor finish
  • Existing lastrico after renovation
Electrical installation
  • Lighting installations with light fittings
Mailbox
  • At the entrance
Security centre
  • At the entrance
External video intercom system
  • Video-intercom system with intercom panel at the main and parking entrance
Communication – staircase, halls
Internal walls and ceilings finish
  • Walls – gres tiles, wall paper, lime-cement painted plaster
  • Gypsum suspended ceilings
Floor finish
  • Gres tiles
Stairs
  • Existing – marble steps
  • New – gres tiles
Internal balustrades
  • Metal monumental and stylized
Electrical and heating installation
  • Electrical installation with light fittings
  • Steel heaters
Fire security system
  • Fire detectors – staircases, corridors, entrances to the building
  • Fire hydrant installation – evacuation roads
Elevators
  • Panoramic electrical with courtyard view 1000kg/ 13 people
  • Electrical 1000kg/ 13 people
  • Tyssenkrupp Elevator
Land development
Pavement
  • Lastrico
Lighting
  • Electrical installation with light fittings
External dustbins
  • External roofed space with waste segregation
Fencing
  • Building walls with entrance gate and parking entrance - secured
Other outside area
  • Parking on the neighbouring plot
CCTV security system
  • External cameras monitored from security/reception room